RERA ID: P52000007138, P52000007610, P52000011789, P52000008195, P52000023622
Disclaimer
All
Units Sold
383 of 594
BHK | Total Units | Units Sold | % Units Sold |
---|
PP3
Construction23%
Rera No. : P52000007138
Completion Date : Mar-2023
Units Sold 86%
48 of 56
QQ12
Construction35%
Rera No. : P52000007138
Completion Date : Mar-2023
Units Sold 91%
29 of 32
QQ16
Construction27%
Rera No. : P52000007138
Completion Date : Mar-2023
Units Sold 47%
15 of 32
QQ21
Construction35%
Rera No. : P52000007138
Completion Date : Mar-2023
Units Sold 78%
25 of 32
R-001
Construction0%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
R-002
Construction0%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
R-003
Construction0%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
R-005
Construction0%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
R-008
Construction0%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
R-010
Construction0%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
R-011
Construction0%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
R-012
Construction0%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
R-024
Construction0%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
R-027
Construction0%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
R-028
Construction0%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
R-030
Construction0%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
R-039
Construction0%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
R-047
Construction0%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
R-054
Construction0%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
R-057
Construction0%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
R-058
Construction0%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
R-062
Construction0%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
R-004
Construction22%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 0%
0 of 1
R-007
Construction70%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
R-009
Construction25%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 0%
0 of 1
R-013
Construction51%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
R-014
Construction50%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
R-015
Construction49%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
R-016
Construction49%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
R-019
Construction51%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
R-022
Construction44%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
R-023
Construction49%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
R-025
Construction52%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
R-026
Construction49%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
R-029
Construction10%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
R-031
Construction20%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
R-032
Construction50%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
R-033
Construction49%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
R-034
Construction50%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
R-035
Construction26%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 0%
0 of 1
R-036
Construction49%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
R-037
Construction10%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
R-038
Construction0%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
R-040
Construction50%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
R-041
Construction49%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
R-042
Construction0%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 0%
0 of 1
R-043
Construction0%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 0%
0 of 1
R-044
Construction0%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 0%
0 of 1
R-045
Construction20%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 0%
0 of 1
R-046
Construction50%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
R-048
Construction50%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
R-049
Construction0%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 0%
0 of 1
R-050
Construction48%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
R-051
Construction36%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 0%
0 of 1
R-052
Construction49%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
R-053
Construction49%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
R-055
Construction48%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
R-056
Construction48%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
R-059
Construction17%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
R-060
Construction48%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
R-061
Construction49%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
R-064
Construction20%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
R-065
Construction37%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
R-006
Construction0%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 0%
0 of 1
R-017
Construction0%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 0%
0 of 1
R-018
Construction0%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 0%
0 of 1
R-020
Construction0%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 0%
0 of 1
R-021
Construction0%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 0%
0 of 1
R-063
Construction0%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 0%
0 of 1
R-030A
Construction50%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
R-064A
Construction20%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
R-064B
Construction34%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
S-003
Construction0%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
S-005
Construction0%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
S-009
Construction0%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
S-010
Construction0%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
S-014
Construction0%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 0%
0 of 1
S-017
Construction0%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
S-019
Construction0%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
S-029
Construction0%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
S-030
Construction0%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
S-001
Construction0%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
S-002
Construction0%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
S-006
Construction0%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
S-007
Construction0%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
S-008
Construction0%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
S-011
Construction10%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
S-012
Construction0%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
S-013
Construction0%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
S-015
Construction0%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
S-018
Construction5%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
S-021
Construction0%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 0%
0 of 1
S-022
Construction0%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 0%
0 of 1
S-023
Construction0%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 0%
0 of 1
S-025
Construction0%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 0%
0 of 1
S-026
Construction0%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
S-027
Construction0%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
S-028
Construction0%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 0%
0 of 1
S-031
Construction0%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
S-032
Construction0%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 0%
0 of 1
S-033
Construction0%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 0%
0 of 1
S-034
Construction0%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 0%
0 of 1
S-004
Construction48%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
S-016
Construction40%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
S-020
Construction20%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
S-024
Construction10%
Rera No. : P52000007610
Completion Date : Dec-2019
Units Sold 100%
1 of 1
PP7
Construction21%
Rera No. : P52000011789
Completion Date : Mar-2023
Units Sold 23%
13 of 56
QQ13
Construction35%
Rera No. : P52000011789
Completion Date : Mar-2023
Units Sold 88%
28 of 32
QQ17
Construction18%
Rera No. : P52000011789
Completion Date : Mar-2023
Units Sold 75%
24 of 32
QQ9
Construction29%
Rera No. : P52000011789
Completion Date : Mar-2023
Units Sold 81%
26 of 32
PP1
Construction20%
Rera No. : P52000008195
Completion Date : Mar-2023
Units Sold 100%
56 of 56
PP2
Construction16%
Rera No. : P52000008195
Completion Date : Mar-2023
Units Sold 59%
33 of 56
P-001
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-002
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-003
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-004
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-005
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-006
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-007
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-008
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-009
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-010
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-011
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-012
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-013
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-014
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-015
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-016
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-017
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-018
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-019
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-020
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-021
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-022
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-023
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-024
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-025
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-026
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 100%
1 of 1
P-027
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-027A
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-027B
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-027C
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
p-028
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-028A
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-029
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 100%
1 of 1
P-030
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-031
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-032
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-033
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-034
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-035
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-036
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 100%
1 of 1
P-037
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-038
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-039
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-040
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-041
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-042
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-045
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 100%
1 of 1
P-046A
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-046B
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 100%
1 of 1
P-047
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-048
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-049
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-050
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-051
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-052
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-053
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-054
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-055
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-056
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-057
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-058
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-059
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 100%
1 of 1
P-060
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 100%
1 of 1
P-061
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-062
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-063
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-064
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-065
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 100%
1 of 1
P-066
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-067
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-068
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-069
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-070
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-071
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-073
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
P-074
Construction0%
Rera No. : P52000023622
Completion Date : Dec-2024
Units Sold 0%
0 of 1
Quarter | Total Units | Units Sold | % Units Sold |
---|
Frequently asked questions
What is RERA Act in Maharashtra?
What is MahaRERA?
What is RERA Number?
Which are the RERA registered projects in Panvel?
Who is the developer for Xrbia Express City?
What is the RERA number for Xrbia Express City?
Where is Xrbia Express City located?
How many apartments are there in Xrbia Express City?
How many apartments are sold in Xrbia Express City?
When the Xrbia Express City is getting completed?
What is area for 2 BHK in Xrbia Express City?
What is area for 3 BHK in Xrbia Express City?
What is area for 4 BHK in Xrbia Express City?